About

Budgets
Services

We develop specialized services related to integral or partial cost estimation for projects of diverse nature, providing technical, methodological support and specialized tools that adapt to the requirements of each client. These services are offered through two main channels:

Consulting

Consulting on cost estimation methods, corporate standardization and best practices, as well as spare parts review processes and development of specialized databases.

request it ↖

Subscription

Subscriptions to the master database of the PCU System platform and budget module, with access to updated information for the preparation of cost estimates.

request it ↖
Work Process

Budget Process

Work division structure

Work division
structure

  • 1. Organized by physical location, work area, contract, discipline, and/or another logical system that allows for the proper structuring and distribution of project information.
  • 2. Set up to 6 levels for complex projects, based on generic templates, specific to the project type.
Accounting Codes

Accounting
Codes

  • 1. Corporate or accounting structures, which identify core products or related areas of focus, enabling an orderly and consistent data classification.
  • 2. Define up to 6 levels. Allows the use of generic templates if necessary. It is aligned with the Master Format standard.
Labor, Equipment, and Material Costs

Labor, Equipment,
and Material Costs

  • 1. For each location, comprehensive labor rates are calculated through an analysis of taxes and payroll charges, taking into account union agreements, contractor rates, regulatory requirements, allowances, and salary adjustments based on the work schedule.
  • 2. Construction equipment rates are determined based on whether the equipment is leased or owned, and include fuel consumption based on workload, consumables, maintenance, insurance, inspections, and other costs.
  • 3. PCU maintains a database of material and equipment prices from suppliers and contractors, as well as manufacturers' catalogs.
Quantity Takeoffs by WBS / COA

Quantity Takeoffs
by WBS / COA

  • 1. Review of engineering drawings and documents; calculation of quantities of equipment, materials, and structures to be installed or modified.
  • 2. When necessary, an engineering analysis is conducted to confirm design criteria, such as the size of secondary and auxiliary equipment.
  • 3. Appropriate quantities are defined as percentages or based on factors for engineering purposes and for components that are not fully defined.
  • 4. The PCU system offers templates for various fields and industries that ensure data acquisition.
Productivity Analysis by Constructive Method

Productivity Analysis
by Constructive Method

  • 1. Estimates the amount of labor required to be performed by a specific crew, including labor, equipment, and materials.
  • 2. Uses as many sub-activity levels as required.
  • 3. Assigns productivity rates to each crew for each task, or uses standard productivity rates from the PCU system that have been adjusted for the project's conditions.
  • 4. Calculates the unit costs and sub-costs.
Overhead Cost Analysis

Overhead Cost
Analysis

  • 1. PCU provides a comprehensive list of potential contractor overhead costs, owner costs, allowances, and contingencies, ensuring that every possible additional cost in a project is taken into account.
Cost Tables Generated at Each WBS and COA Level

Cost Tables Generated
at Each WBS and
COA Level

  • 1. PCU provides a dedicated reporting module.
  • 2. Project execution scheduling is performed at each and every level of the WBS and COA.
  • 3. Any schedule designed in MS Project or other scheduling software available is imported into the PCU system and automatically aligned by WBS & COA.
Cash Flow and Resource Forecast

Cash Flow and
Resource Forecast

  • 1. Tailored to the administrative needs using PCU’s dedicated reporting modules.
Cost Estimate Document

Cost Estimate
Document

  • 1. Details every assumption and exclusion.
  • 2. Generated with a standard or custom template based on data within PCU’s system.
  • 3. A standalone document or section ready to be copied into other reports.